With reference to UNI 11224: 2011 Standard, Sebino undertakes to carry out a series of tests on a six-months basis.
- Test of the main unit status and indications;
- Main unit signal test;
- Local reporting systems test;
- Condition and alarm signal test;
- Reporting and phone numbers test:
- Annotation of tested reports;
- Annotation of out-of-order reports out
- Smoke sensor and / or barrier test with field detector testing;
- System suction test (in any)
- Fault reporting and status test;
- Power source status test;
- General system check;
- Final technical report on the system status.
- Do you want to receive a dedicated consultation or quote?